01423 799 950
info@energyline.ltd.uk

33KV Terminal Support Studies

Case Studies
> 33KV Terminal Support Studies

Project info

Energyline has worked with WPD on the 11kV and 33kV distribution network that it operates. As part of an ongoing programme of works, a feasibility study was undertaken to assess a reconfiguration and potential reutilisation of an existing, aged, 33kV lattice steel terminal support, and to assess the pros and cons of replacement with an equivalent 33kV wood pole support.

Principal activities

Topographical and precision surveys of the existing support(s) and terrain.

Line and support modelling using PLS CADD

Tower Climbing survey of the lattice steel termination support

Clearance study to confirm existing and new clearances for the connection and proposed downlead configurations

Load and strength analysis using PLS Tower and PLS Pole to determine the suitability of the proposed supports

Line profile and layout plans

Comprehensive report on findings, including clear conclusions and recommendations

Energyline completed all the services listed above in-house.

Contact us to discuss your next project

Contact us

Contact us

Energyline Ltd, Jubilee Court, Copgrove, 
North Yorkshire HG3 3TB

Tel: 01423 799950
Policies
Terms & ConditionsPrivacy Policy
Certificate number 1122
ISO 9001   ISO 14001   ISO 45001
Copyright © 2024 Energyline All Rights Reserved
Design + Build LoyaltyMATTERS
chevron-down linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram