Construction of 132kV overhead line supports on steep and rocky ground required access for construction traffic and working platforms for cranes and piling rigs. In addition to the design of the steel pole supports and piled foundations, access roads were designed to consider the limitations of the existing ground profiles, maximum gradient limits for plant and equipment and ground conditions. The civil engineering design works included:

  • Ground profiling
  • Slope stability assessments
  • Road and working platform design
  • Drainage,
  • Slope stability analysis
  • Ground investigation
  • Mensuration

Contact us to discuss your next project

Contact us

Contact us

Energyline Ltd, Jubilee Court, Copgrove, 
North Yorkshire HG3 3TB

Tel: 01423 799950
Policies
Terms & ConditionsPrivacy Policy
Certificate number 1122
ISO 9001   ISO 14001  
ISO 45001
Copyright © 2024 Energyline All Rights Reserved
Design + Build LoyaltyMATTERS
chevron-down linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram