01423 799 950
info@energyline.ltd.uk

Kinardochy Substation (Perth & Kinross)

Case Studies
> Kinardochy Substation (Perth & Kinross)

Project info

Client – SSE

Energyline were responsible for design of staged ground investigation for the pre-construction stage tender design. The scope included development of an investigation strategy to allow for design of 25m deep rock slope designs in variably weathered neoproterozoic sequences, as well as a sampling and testing regime to allow for borrow material assessment for the proposed 20m high platform construction.

Techniques such as; geomechanical logging of angled core boreholes, downhole geophysical ATV survey, and seismic survey within inaccessible locations were adopted to aid tender stage estimates.

Contact us to discuss your next project

Contact us

Contact us

Energyline Ltd, Jubilee Court, Copgrove, 
North Yorkshire HG3 3TB

Tel: 01423 799950
Policies
Terms & ConditionsPrivacy Policy
Certificate number 1122
ISO 9001   ISO 14001   ISO 45001
Copyright © 2024 Energyline All Rights Reserved
Design + Build LoyaltyMATTERS
chevron-down linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram