01423 799 950
info@energyline.ltd.uk

Mybster – Shin Ground Investigation (Sutherland)

Case Studies
> Mybster – Shin Ground Investigation (Sutherland)

Project info

Client – SSE

Management of three month Foundation Evaluation Study investigation phase to determine suitability of existing foundation on 100km OHL route on Scotland’s north-east coastal route.

Tasks included completion of boreholes at twenty (20) remote tower sites on steep gradients and in peatland terrain, drilling in a range of challenging ground conditions using an assortment of rotary coring techniques and flush types to achieve recovery and depth targets.

Contact us to discuss your next project

Contact us

Contact us

Energyline Ltd, Jubilee Court, Copgrove, 
North Yorkshire HG3 3TB

Tel: 01423 799950
Policies
Terms & ConditionsPrivacy Policy
Certificate number 1122
ISO 9001   ISO 14001  
ISO 45001
Copyright © 2024 Energyline All Rights Reserved
Design + Build LoyaltyMATTERS
chevron-down linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram